TP-LINK CPE210 Guía de usuario Pagina 11

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 77
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 10
Pharos Control User Guide
8
Step 10. On the following screen, click Finish to complete the installation and launch the Pharos
Control Server.
Figure 1-10 Complete Installation
1.3 Before Login
Ensure the server is reachable from the client before login. If the server is behind an NAT gateway,
please refer to the gateway’s reference guide to open the corresponding port as configured in
Figure 1-7 if you want to access the Pharos Control Server from the Internet.
Return to Contents
Vista de pagina 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 76 77

Comentarios a estos manuales

Sin comentarios